Abstract
This paper proposes a mathematical model to deal with project scheduling problem under vagueness and a framework of a heuristic approach to fuzzy resource-constrained project scheduling problem (F-RCPSP) using heuristic and metaheuristic scheduling methods. Our approach is very simple to apply, and it does not require knowing the explicit form of the membership functions of the fuzzy activity times. We first identify two typical activity priority rules, namely, resource over time and minimum slack priority rules. They are used in the F-RCPS problem and in the initial solution of Taboo search (TS) method. We improved the TS algorithm method for the solution of F-RCPSP. Our objective is to check the performance of these rules and metaheuristic method in minimizing the project completion time for the F-RCPS problems. In our study, we use trapezoidal fuzzy numbers (TraFNs) for activity times and activity-on-nodes (AON) representation and compute several project characteristics such as earliest, latest, and slack times in terms of TraFNs. The computational experiment shows that the performance of the proposed TS is better than the evaluation and light beam search algorithms in the literature. © 2012 Wiley Periodicals, Inc. © 2012 Wiley Periodicals, Inc.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.