Abstract

Fuzzy regression model is developed to construct the relationship between independent variable and dependent variable in a fuzzy environment. In order to increase the explanatory performance of fuzzy regression model, the least-squares method usually is applied to determine the numeric coefficients based on the concept of distance. In this paper, we consider the fuzzy linear regression model with fuzzy input, fuzzy output, and crisp parameters, introduce a new distance based on the incentre point of triangular fuzzy number, merge least-squares method with the new incentre distance, and propose least-squares incentre distance (LSID) method. Finally, an example of employee job performance is given to illustrate the effectiveness and feasibility of the method. Comparisons with existing methods show that the calculation of LSID method is simpler on the premise of total estimation error satisfaction.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call