Abstract

In this research, an integrated vendor-buyer inventory model with a random number of defective items under fuzzy random lead time demand is developed. The length of lead time affects the competitive abilities of a business directly and it can be controlled by adding a crashing cost. It is assumed that the lead time demand is normally distributed and the shortages are permitted, which are partially backlogged. In the model, lead time demand, annual demand rate, adjustable production rate, and backorder fraction are imprecise in nature and are represented by the triangular fuzzy numbers. Signed distance method is used to defuzzify the fuzzy total inventory cost. The objective is to determine simultaneously the optimal order quantity, the lead time, and the number of deliveries, which minimise the expected total average cost. An algorithm procedure of finding the optimal solution is developed. Furthermore, numerical example and sensitivity analysis are carried out to illustrate the proposed integrated model.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.