Abstract

Using PERT (Program evaluation and review technique), one assumes that the time required to carry out the individual tasks in a project can be approximated using a beta distribution. It is assumed that the parameters of these distributions (the minimum, maximum and most likely times) are estimated by experts in accordance with the properties of the beta distribution. However, this is not always the case. This article shows how one may analyse the time required to carry out a task. Two approaches to describing uncertainty regarding the duration of tasks are used: probabilistic and fuzzy. This article proposes a mixture of a beta probability distribution with a generative probability distribution to describe the duration of a task. An illustrative examples are given.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.