Abstract

Carbon capture and storage (CCS) is an important technology option for reducing industrial greenhouse gas emissions. In practice, CO2 sources are easy to characterize, while the estimation of relevant properties of storage sites, such as capacity and injection rate limit (i.e., injectivity), is subject to considerable uncertainty. Such uncertainties need to be accounted for in planning CCS deployment on a large scale for effective use of available storage sites. In particular, the uncertainty introduces technical risks that may result from overestimating the limits of given storage sites. In this work, a fuzzy mixed integer linear program (FMILP) is developed for multi-period CCS systems, accounting for the technical risk arising from uncertainties in estimates of sink parameters, while still attaining satisfactory CO2 emissions reduction. In the model, sources are assumed to have precisely known CO2 flow rates and operating lives, while geological sinks are characterized with imprecise fuzzy capacity and injectivity data. Three case studies are then presented to illustrate the model. Results of these examples illustrate the tradeoff inherent in planning CCS systems under parametric uncertainty.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.