Abstract

In this paper, a two-stage method has been proposed for solving Fuzzy Multi-objective Linear Programming Problem (FMOLPP) with Interval Type-2 Triangular Fuzzy Numbers (IT2TFNs) as its coefficients. In the first stage of problem solving, the imprecise nature of the problem has been handled. All technological coefficients given by IT2TFNs are first converted to a closed interval and then the objectives are made crisp by reducing a closed interval into a crisp number and constraints are made crisp by using the concept of acceptability index. The amount by which a specific constraint can be relaxed is decided by the decision maker and thus the problem reduces to a crisp multi-objective linear programming problem (MOLPP). In the second stage of problem solving, the multi-objective nature of the problem is handled by using fuzzy mathematical programming approach. In order to explain the methodology, two numerical examples of the proposed methodology in Production planning and Diet planning problems have also been worked out in this paper.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.