Abstract

Day-ahead unit commitment (UC) solution methods seek to determine the status and output of all available generators. In a world with an increasing integration of renewable energy sources such as wind electric generators (WEG), the UC solution process must model and include WEGs too in the decision making process. Power output of WEGs in a day-ahead decision making process are usually modeled using a short term probabilistic forecast. Inclusion of WEGs introduces uncertainty in the solution that may be quantified through an imbalance risk function. Thus a UC solution method should seek a solution to minimize cost and risk in schedule. Two strategies are proposed in this paper to minimize costs and handle risks introduced due to WEGs. These formulations are posed as fuzzy optimization models and are solved using the MILP (mixed integer linear programming) technique. The proposed strategies are tested on a 26- and a 100-generator systems with associated transmission networks that have 3 and 6 wind generators each. The results with two strategies of handling WEGs are discussed.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.