Abstract
Flow shop scheduling (FSS) problem constitutes a major part of production planning in every manufacturing organization. It aims at determining the optimal sequence of processing jobs on available machines within a given customer order. In this article, a novel biobjective mixed-integer linear programming (MILP) model is proposed for FSS with an outsourcing option and just-in-time delivery in order to simultaneously minimize the total cost of the production system and total energy consumption. Each job is considered to be either scheduled in-house or to be outsourced to one of the possible subcontractors. To efficiently solve the problem, a hybrid technique is proposed based on an interactive fuzzy solution technique and a self-adaptive artificial fish swarm algorithm (SAAFSA). The proposed model is treated as a single objective MILP using a multiobjective fuzzy mathematical programming technique based on the ϵ-constraint, and SAAFSA is then applied to provide Pareto optimal solutions. The obtained results demonstrate the usefulness of the suggested methodology and high efficiency of the algorithm in comparison with CPLEX solver in different problem instances. Finally, a sensitivity analysis is implemented on the main parameters to study the behavior of the objectives according to the real-world conditions.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.