Abstract

This article proposes an effective approach to solve the network reconfiguration problem during power system restoration. In the stage of network reconfiguration, the sequence of line energizing, the plan to restore the critical loads of each bus, and the start of generating units should be confirmed. The proposed technique is based on an adaptively tunable fuzzy logic controller, in which the membership functions are tailored according to inputs adaptively. In this way, the restoration sequence of loads and generators can be determined uniquely. The proposed network reconfiguration strategy is tested on IEEE 118-bus system and results suggest that the method is effective and feasible.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.