Abstract

Highway construction progress risks not only influence the development of an enterprise, but also have a great impact on the national overall strength. This paper attempts to analyze construction progress risks of highway qualitatively and quantitatively from the perspective of theory and practice. The weight of each progress risk index could be obtained by using the analytic hierarchy process and entropy-weighted method, considering the expert’s credibility at the same time. Then the highway construction progress risk of overall highway project is analyzed by the fuzzy comprehensive evaluation theory, which can be used to assess highway construction progress risk objectively. The results show that it could improve the cognitive ability of risk management of highway engineering project construction.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.