Abstract
In today's competitive environment, it is essential to design a flexible-responsive manufacturing system with automatic material handling systems. In this article, a fuzzy mixed integer linear programming model is designed for cell formation problems including the scheduling of parts within cells in a cellular manufacturing system (CMS) where several automated guided vehicles (AGVs) are in charge of transferring the exceptional parts. Notably, using these AGVs in CMS can be challenging from the perspective of mathematical modeling due to consideration of AGVs’ collision as well as parts pickup/delivery. This article investigates the role of AGVs and human factors as indispensable components of automation systems in the cell formation and scheduling of parts under fuzzy processing time. The proposed objective function includes minimizing the makespan and intercellular movements of parts. Due to the NP-hardness of the problem, a hybrid genetic algorithm (GA/heuristic) and a whale optimization algorithm (WOA) are developed. The experimental results reveal that our proposed algorithms have a high performance compared to CPLEX and the other two well-known algorithms, i.e., particle swarm optimization and ant colony optimization, in terms of computational efficiency and accuracy. Finally, WOA stands out as the best algorithm to solve the problem.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.