Abstract

In past work the authors demonstrated how fuzzy concepts can easily be used in the Johnson algorithm for managing uncertain scheduling on two-machine flow shops. This article extends these concepts to fuzzy flow shops with more than two machines. A new fuzzy heuristic flow-shop scheduling algorithm (the fuzzy Gupta algorithm) is then designed, as optimal solutions seem unnecessary for uncertain environments. Also, the conventional Gupta algorithm is shown as a special case of the fuzzy Gupta algorithm with special membership functions being assigned.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call