Abstract

ABSTRACT The critical chain algorithm, developed by Goldratt, is different from the traditional project management method like PERT. The main difference between the two approaches mentioned above is the former consider the projector psychology factor, but the latter doesn't. Since the critical chain algorithm has covered the projector psychology factor, the project management is improved. This research based on the basis of fuzzy theory and a fuzzy-critical-chain-based project algorithm is modeled. This algorithm modeled by this research is for single project case. The determination of buffer time in critical chain was improved in order to obtain a reasonable feeding buffer and project buffer. An example was selected to illustration and to enhance practical application. Finally, a quantitative comparison among fuzzy PERT, critical chain, and fuzzy critical chain is done.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.