Abstract

In the construction of large bridge engineering, ultra-long piles are often used in a kind of deep foundations. Due to the complex characteristics of pile foundation, site conditions, construction methods and processes have the particularity, the super long pile, inevitably has broken pile, necking, segregation and other defects, so the integrity of the pile need to be evaluated. This paper combined pile integrity testing with fuzzy comprehensive evaluation, and put forward a set of the pile body integrity fuzzy comprehensive evaluation method which is latest and has reason-able basis. Through the case study and verification of a large number of long piles, and comparing the evaluation results obtained by fuzzy comprehensive evaluation method with those obtained by the current evaluation method, the current evaluation method was found that it really has some deficiencies. However, the fuzzy compre-hensive evaluation method presented in this paper solved these deficiencies, and achieved good results.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.