Abstract

Selecting an appropriate bridge construction method is essential for the success of bridge construction projects. The Analytical Hierarchy Process (AHP) method has been widely used for solving multi-criteria decision-making problems. However, the conventional AHP method is incapable of handling the uncertainty and vagueness involving the mapping of one's preference to an exact number or ratio. This paper presents a fuzzy AHP model to overcome this problem. The proposed approach employs triangular and trapezoidal fuzzy numbers and the α-cut concept to deal with the imprecision inherent to the process of subjective judgment. A case study that evaluates bridge construction methods is presented to illustrate the use of the model and to demonstrate the capability of the model.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.