Abstract
The objective of existing linear programming methods of earthwork‐system optimization in road construction has been either minimizing the cost or maximizing profit, generally without considering the project duration. This paper develops a linear programming model incorporating the project duration. The model attempts to optimize a comprehensive earthmoving system in road construction by comparing alternative fleets (from available fleets) to provide an optimum material distribution and appropriate plant fleets to complete a project within the specified time. The situations where different degrees of compaction, availability of various soil strata at cut sections and borrow pits, and selection of borrow/disposal sites are also incorporated. Among the possible extensions, equipment sharing between fleets and sequence of operations present at cut and fill sections are examined. The validity of the model is demonstrated by applying it to a numerical example, providing additional tools to the management such as the minimum project‐completion time, the cheapest project cost and corresponding duration achievable with available resources.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Journal of Construction Engineering and Management
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.