Abstract

This paper presents a performance evaluation of two solutions to reduce computational burden of the traditional Weighted Least Squares Algorithm for power system state estimation: Simplified methods SWLS1 / SWLS2 based on full constant matrices and Fast decoupled FDWLS based on decoupled constant matrices. First, the algorithms were tested on IEEE 14 and 118 bus transmission systems. Second, the solutions were tested on a rural distribution feeder to evaluate the response of the algorithms to high R/X ratio. Results show that for transmission systems, FDWLS is the fastest method but more sensitive to erroneous measurements. Simplifications considered in FDWLS, are not valid in distribution systems with high R/X ratio this results in slowing down the algorithm convergence speed considerably compared to SWLS2 which performs well. SWLS2 algorithm presents a promising solution to reduce computation time for application in future smart grid.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.