Abstract

A new antigalloping device for overhead lines with bundle conductors was introduced ten years ago, after laboratory tests and observations on actual 400 kV lines. A systematic full-scale test was performed in Kazakhstan in order to better evaluate torsional damper and detuner (TDD) efficiency. This report details the test station and the results obtained over a several month period of testing and measurement. The tests were carried out thanks to the mutual efforts of the ESSP and the Kazakh Power Research Institute (KazNIIE) at the field tests stand located in Chokpar.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.