Abstract

As a inclined mega-grid suspend-dome, the prestressing constructi of Dalian gym is very complex. Full-process analysis for the pretensioning scheme should be done before construction. Compared with other pretension methods, a relatively proper scheme of stretching radial cable is put forward and analyzed using construction full-process simulation. The length of active cables without stress is controlled by changing temperature, so pretension is put on cables; Cable tension and removing of temporary support system are simulated using birth and death technology, therefore the structure response of different construction stage and in which stage removing temporary supports is proper are acquired, which provide referenced data for controlling construction safety and precision.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.