Abstract

Gas production from gas wells is affected by formation pressure and wellbore outflow during gas production. To increase the daily gas production and obtain smooth and efficient gas production gas wells, methods such as wellbore shut-in pressure recovery and foam injection and drainage for gas production are usually adopted. In this paper, the gas-carrying liquid model, capacity prediction model, and pressure recovery model are utilized to establish a full-cycle production prediction method for newly developed gas wells. Combining the initial development pressure, gas production, and water production parameters of the gas well, the gas production prediction is obtained for the next few years. Meanwhile, the implementation time of the forced drainage method is calculated and obtained.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.