Abstract

The Babcock and Wilcox Company (B&W) normally uses part-length axial power shaping rods (APSRs) for core axial power distribution control. The development and implementation by B&W and the Sacramento Municipal Utility District of a procedure for extending cycle length by removing the APSRs at the end of cycle 3 of Rancho Seco Nuclear Generating Station is explained. Increased core reactivity and hence greater cycle length were successfully achieved. Neither the reactor protection system nor normal operating limits were violated during the APSR withdrawal procedure. Further, pellet-cladding interaction was avoided, and primary coolant feedand bleed requirements were within the capacity of the plant evaporators. During the 22 h at less than full power, the average capacity factor was 81.1%, a reasonable tradeoff in light of the extension of cycle 3 by 10 effective full-power days (EFPDs). Successive use of this technique over following cycles yields average gains of 5 EFPDs per cycle.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.