Abstract

A new train operation model proposed here not only considers the flexibility of train regulation, or train rescheduling problem, but also the objectives of timetabling process. A genetic algorithm is applied to solve this problem efficiently. Thus no matter the problem is planning the timetable of trains, the unusual passenger flow occurrence or the incident caused delay, our model will make the train regulation as the same as the timetable construction. This will simplify the work of administration. Our model also shows that once the delay occurred, the waiting time of the passengers will be the cost to delay every train. If the delay is not large enough, the system can have some rooms for removing the influence of the delay through our model.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.