Abstract
With a detailed but not site-specific building program, the librarians at Rhode Island School of Design made the case for a new library three times the size of the existing facility. The site became specific with the donation of an early 20th-century grand banking hall. This paper addresses the role of the librarian in the design and construction process and includes an analysis of the way the new library meets the program objectives. In the early 1990’s after several early attempts to resolve the library’s space constraint at Rhode Island School of Design, the librarian was given a useful bit of advice: Stop trying to find the space. You must focus first on the program. What is it that you really need?
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.