Abstract

With the liberalisation of the rail freight market, the number of railway undertakings in operation is increasing. Trains run by several railway undertakings (RUs) converge at industrial lines leading up to terminals. Here, uncoordinated interaction between mainline RUs and limited infrastructure capacity leads to bottlenecks, which reduces resource utilisation of railway undertakings. Outsourcing last-mile operations to an independent local railway undertaking can improve capacity utilisation and decrease the time engines of mainline engines spend within the considered network. In this paper, we propose the Industrial Line Scheduling Problem with multiple RU, a resource scheduling model for freight trains at industrial lines. The aim is to minimise unproductive time of mainline engines and the number of deployed local engines. The results show that the potential savings per employed local engine are highly dependent the timetables of inbound and outbound trains within the network, the dwell time of railcars and on the degree of local railway undertaking involvement.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.