Abstract

This paper deals with the issue of the production of electricity required for an electric delivery van to carry out its daily mission. In particular, the technical solutions adopted for the generation and management of energy from renewable energy sources will be illustrated. Subsequently a vehicle routing problem with time windows is formulated in order to optimize the freight distribution at urban level completing the exploration of two aspects, infrastructures and management of the service, considered fundamental for dealing with the distribution of freight in a system scenario. The article describes a case study for the delivery of freight within the last mile in which the installation of renewable energy production plants is proposed in the same place where the urban distribution center has been planned. The area dedicated to freight handling is thus proposed in the work as an energy platform as well as logistics. The optimization of a freight delivery service is performed in order to reduce the energy used by the vehicle in its daily travels and some aspects related to the governance (i.e. time windows allowed for the delivery/pick-up operations) are included in the problem constraints. A test application, considering a set of 84 retailers, has been carried out as case study in the Capo d'Orlando municipality (Sicily, Italy).

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.