Abstract

Abstract Current precast production scheduling methodologies have limited applicability in practice due to the neglect of real-world production circumstances. To improve, a two-hierarchy simulation-GA hybrid model for precast production (TSGH_PP) is developed to (1) specialize the operations of precast production according to their characteristics, (2) incorporate the uncertainty in processing time in practice, and (3) model the process-waiting time on the flow of work based on the genetic algorithm and discrete event simulation. In the proposed model, the trade-off can be achieved between the conflicting goals of the on-time delivery of precast components and minimum production cost, and the production resources configuration is optimized to cut down resource waste. Finally, a real case study is conducted to test the validity of TSGH_PP approach. The developed model fills the gap in simulation system design and methodology for precast production, and increases the applicability of precast production scheduling methods in real construction projects.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.