Abstract

We propose a novel mode analysis and differential mode delay measurement method for an optical fiber using Fourier-domain low-coherence interferometry. A spectral interferometer based on a Mach-Zehnder interferometer setup was used with a broadband source and an optical spectrum analyzer to detect relative temporal delays between the guided modes of a few-mode optical fiber by analyzing spectral interference signals. We have shown that experimental results of the proposed method agree well with those results obtained by using a conventional time-domain measurement method. We have demonstrated that this new mode analysis technique has high sensitivity (<60 dB) and very good resolution (<1 ps/m).

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.