Abstract

AbstractIn mid 1980s, the construction of seven smaller tanks having maximum volume of 7,500 m3 and maximum diameter of 25 m for the storage of liquid goods took place in the Port of Koper on the deposit of 28 m thick soft clayey layer. Ground improvement with geosynthetic encased stone columns and preloading was used (Sovinc, Vogrinčič, 1991). Due to satisfactory performance of these tanks, six new large tanks were first supposed to be built in similar way. Due to time constraints and risks involved with much larger tank sizes (V = 20,000 m3 and D = 48.7 m) in combination with variable ground conditions, these new tanks were finally founded on driven tubular steel piles. The paper will present step‐by‐step decision‐making process from the risk management perspective supported by ground investigations, pile load tests and numerical modelling. Finally, the measured behaviour of the new tanks after first 9 years of operation will be shown and practical experience with maintenance of these tanks and connecting pipelines will be shortly presented.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.