Abstract

The model, which effectively contributes to creation of maximum reasonable value of construction projects, was proposed. The proposed system is characterized by the fact that due to its convenient coherence, it adjusts the influence of its separate methods (elements) on project value in a cumulative manner. The need for such a model was driven by global challenges, such as necessity to reduce greenhouse gas emissions and to increase power efficiency of satisfaction of social needs. Characteristic feature of the proposed model is that it is composed of six interacting components, which collectively are self-sufficient for efficient engineering and management of construction projects. This concept is presented in the form of a crystal of cumulative application of three pairs of methods. The first pair includes value engineering and building information model. The second pair includes benefits-costs analysis and the theory of dynamics of project value. The third pair includes profiling of contract systems and pricing strategies. Each element of the proposed model, playing its natural role, coherently complements and reinforces its other elements. This model allows balanced decision making in terms of availability of various competing priorities of all stakeholders. The key priority of the cumulative model is preventive reaction to potential problems in the course of project implementation. It was established that the aforementioned pairs of methods and the model in general bring convenient and efficient synergy to architecture, engineering and management of construction projects. The synergy, which is a basic feature of the proposed model, provides a presence of two characteristics at the same time: complete coverage of project tasks that are solved and convenient compactness. It is the main advantage of the Crystal model of value management. Dynamics of usefulness and value of the project of office center construction within several consecutive sessions of model application model was calculated, it was shown that quality of project result almost reached its maximum. It demonstrates feasibility of further research in this direction and expansion of a range of projects of model application

Highlights

  • The mental structure “Live and let others live” has been popular for a long time

  • The theory and practice of project management have been actively improved in line with the modern requirements to the development of socio-economic systems

  • The task of creation and implementation of forward-looking strategies for achieving optimal value throughout a whole range of consecutive project cycles is becoming increasingly important. This task is closely linked to the development of technologies for innovative solutions to engineering problems

Read more

Summary

Introduction

The mental structure “Live and let others live” has been popular for a long time. it is acquiring a special sense under current conditions. The task of creation and implementation of forward-looking strategies for achieving optimal value throughout a whole range of consecutive project cycles is becoming increasingly important. This task is closely linked to the development of technologies for innovative solutions to engineering problems. Formulation of a comprehensive model to solve these tasks in the process of project preparation and implementation is a scientific problem. In this case, it is important that such a model is not complicated and cumbersome, because it would be impractical to use otherwise. The model should not be amorphous, it must acquire a complete and distinct form

Literature review and problem statement
The aim and objectives of the study
Findings
Formulation of requirements to the created cumulative concept
Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.