Abstract

During the mining process of Hami open-pit coal mine, a large number of cracks appeared on the ground surface near the top of the end slope, which affected the stability of the slope and the subsequent safe mining of resources. By analyzing the deformation of rock stratum, the position of weak interlayer in the slope was determined. Considering the rock mass with weak interlayer as a complete mechanical system, the mechanical model of the rock mass system with weak interlayer was established, and the evaluation index of rock failure degree before slope instability was proposed. The failure mode of slope with weak interlayer is as follows: sliding failure-cutting layer failure-tension failure. The safety factor of slope decreases first and then increases with the increase of the depth of the weak interlayer, and gradually decreases with the increase of the inclination of the weak interlayer. The pressing foot of slope can be used in landslide control of slope with weak interlayers, and the optimal pressing foot solution to ensure the safe mining of final slope coal resources was determined to be a pressing foot height of 35 m and pressing foot width of 20 m.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.