Abstract

A case study of a deliberate change in the design of a new Eucalyptus plantation, aimed at alleviating water impacts, was carried out in an experimental catchment located in the center part of the State of São Paulo, Brazil. It involved the identification of saturated areas in the catchment, based essentially on topographic analysis, as a tool to help in zoning of the new forest plantation, with the objective of improving the flow of water to downstream users, as well as to avoid water quality changes. The design involved the allocation of part of the identified saturated areas as water conservation areas, as well as a change in the spacing of the planting. Measurements of tree growth at the age of two years of the new plantation reveal that the forest productivity of the new plantation design, in terms of projected annual wood increment at the end of the rotation, will be similar to the old plantation scheme, despite the loss of planted area. Preliminary results of the continuous monitoring of the catchment water balance appear to indicate that the objective of increasing the catchment water yield may possibly also be achieved.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.