Abstract

Under the extensive grazing conditions experienced in Australia, pastoralists would benefit from a long lead-time seasonal forecast issued for the austral warm season (November–March). Currently operational forecasts are issued publicly for rolling 3-month periods at lead-times of 0 or 1 month, usually without an indication of forecast quality. The short lag between the predictor and predictand limits use of forecasts because pastoralists operating large properties have insufficient time to implement key management decisions. The ability to forecast rainfall based on the Southern Oscillation Index (SOI) phase system was examined at 0–5-month lead-times for Australian rainfall. The SOI phase system provided a shift of adequate magnitude in the rainfall probabilities (–40 to +30%) and forecast quality for the 5-month austral warm season at lead-times >0 months. When data used to build the forecast system were used in verification, >20% of locations had a significant linear error in probability space (LEPS) and Kruskal–Wallis (KW) test for lead-times of 0–2 months. The majority of locations showing forecast quality were in northern Australia (north of 25°S), predominately in north-eastern Australia (north of 25°S, east of 140°E). Pastoralists in these areas can now apply key management decisions with more confidence up to 2 months before the November–March period. Useful lead-times of ≥3 months were not found.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.