Abstract

<p>The paper concerns the construction of an extradosed bridge in Poland. The bridge has been designed as a four span structure and was erected using balanced cantilever method. The length of the main span is 206 m and it holds the record for extradosed bridges in Europe. In order to improve safety of the building during construction, each of the cantilevers was stabilized by a temporary pier. The values of normal forces in temporary piers were controlled by sensor gauges installed on temporary steel bearings. Based on the measured deformations, real-time charts of normal forces in the temporary piers were recorded. Normal forces in temporary piers changed when the arms of cantilevers were loaded asymmetrically. The increase in normal forces resulted from the movement of form travellers and segment casting. In this way theoretical changes of normal forces values in temporary piers could be compared with the real ones.</p>

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call