Abstract

In order to make up for the shortcomings of existing theory calculation methods for circular diaphragm walls, an alternative calculation method was developed with a clear concept based on the circular cylindrical shell theory and superposition principle in elasticity and named the circular cylindrical shell theory calculation method (CCSTCM). We took the north anchorage circular foundation pit of G3 Tongling Yangtze River Highway and Railway Bridge as an example and calculated and analyzed it by the proposed CCSTCM, finite element numerical simulation method (FENSM) and site monitoring. As a result, we obtained the radial displacement, circumferential stress and vertical bending moment of the circular diaphragm wall, and then summarized their regularities. By researching the results of the CCSTCM (TCR), the results of the FENSM (NSR) and the results of the site monitoring (SMR), the following conclusions could be drawn: the numerical calculation model established was reasonable; the variation trends of the data curves of the TCR were highly similar to those of the NSR and SMR; and the TCR were slightly larger than the NSR but slightly smaller than the SMR, and closer to the SMR in general. Finally, the proposed CCSTCM was proven to be correct and applicable and could be used in similar circular diaphragm wall projects.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.