Abstract

To understand the stressed characteristic of fault rupture zone under high hydraulic pressure, based on the F3 fault of Guanshan tunnel the software 2D-FLAC is adopted to found the fluid-solid coupling numerical model of ground water seepage and evolution in the process of tunnel structure in fault rupture zone under high hydraulic pressure and analyze the mechanical character of tunnel structure in three schemes of whole block, free discharge and limit discharge. The result shows that in the whole block condition, the partial seepage of ground water happened and the lining thickness should be more than 60cm; Regardless of water pressure, the rock is damaged at a large range, and the minimum safety factor of the lining structure meet the tunnel design standard; In the limit discharge condition, the grouting reinforced ring makes the effect of limiting drainage and keeping the tunnel’s stability in the construction. The tunnel drainage gets smaller with the increase of grouting ring’s thickness and the decrease of grouting ring’s penetration parameter; setting the drainage system can decrease the hydraulic pressure at the back of lining as well as grouting and water blocking.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.