Abstract

As to the thermodynamic performance of steam turbine to be operated by geothermal steam mixed with noncondensable gases, the 1st and 2nd Reports were presented to report on a theoretical calculation method. To confirm the accuracy of the calculation method, we have compared calculated values with actually measured values based on the results of performance tests conducted at a geothermal power generating plant. The result of comparison and examination shows that the result of calculation wherein the effect of gaseous components is taken into consideration well coincide with the results of performance tests within the range of measurement tolerance, and proves the reasonability of the calculation method.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.