Abstract

The paper is concerned with the two-machine flow shop, where each job needs storage space (a buffer requirement) during the entire time of its processing. The buffer requirement is determined by the duration of job’s first operation. The goal is to minimise the time needed for the completion of all jobs. This scheduling problem is NP-hard in the strong sense even for very restricted cases such as the case with a given order of jobs processing on one of the machines. The paper contributes to the efforts of establishing the borderline between the NP-hard and polynomial-time solvable cases by proving that there exists a polynomial-time algorithm which constructs an optimal schedule if the duration of each operation does not exceed one-fifth of the buffer capacity. The presented polynomial-time algorithm is used as a basis for a heuristic for the general case. This heuristic is complemented by a Lagrangian relaxation based heuristic and a bin-packing based constructive heuristic. The heuristics are tested by computational experiments.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call