Abstract

This paper deals with the multicriterion approach to flow shop scheduling [FSS] problems by considering makespan time and total flow time. The primary concern of flow shop scheduling is to obtain the best sequence, which minimizes the makespan, flow time, idle time, tardiness, etc. In this work, makespan and total flow time of the jobs are considered for minimization. Three heuristic algorithms namely HAMC1, HAMC2 and HAMC3 have been proposed in this paper. The effectiveness of the heuristics has been analyzed using the problems generated by Taillard [16]. The results of the problems are compared with the solution procedures proposed by Rajendran [15]. The new hybrid algorithms are developed by taking the seed sequences yielded by a method proposed by Rajendran [14] in his work to minimize flow time and improving it using search algorithm. The hybrid algorithm gives better results.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.