Abstract

The flow-shop scheduling problem with exact delays is generalization of no-wait flow-shop scheduling in which an exact delay exists between the consecutive tasks of each job. The problem with distinct delays to minimize the makespan is strongly NP-hard even for the two-machine case with unit execution time tasks. Providing polynomial-time solutions for special cases of the problem, we show that the two-machine permutation flow-shop case is solvable in O(nlogn) time, while the case with more than two machines is strongly NP-hard. We also show that the multi-machine case with delays following the ordered structure possesses the pyramidal-shaped property and propose an O(n2)-time dynamic program to solve it. We further improve the time complexity of the solution algorithm to O(nlogn) under certain conditions.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.