Abstract

Located at the exit of the last gorge of the middle reaches of the Yellow River, the Xiaolangdi Multipurpose Dam Project occupies a critical position in controlling both runoff and sediment of the River. typical tributary Zhenshui is the biggest tributary of Xiaolangdi Reservoir and its original storage capacity is 1.767 billion m3.This paper shows the process of the longitudinal profile of tributary Zhenshui,which faces the serious sediment bar growth at its mouth. Discussion is processed to show the possibility.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.