Abstract

To satisfy U.S. Atomic Energy Commission (AEC) safety criteria, a required evaluation of the worst site-related flood is performed for the Crystal River Plant, located on the Gulf Coast of Florida, the probable maximum stillwater flood levels are likely to be a result of the probable maximum hurricane. Flood protection requirements for the Crystal River Plant are determined by considering the most severe combination of probable maximum hurricane parameters for the Gulf Coast Region. These parameters are used as input to a model of hurricane surge generation and attendant wave activity in order to determine the maximum flood levels at the Crystal River Plant.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.