Abstract

Abstract. Following the developments in short- and medium-range weather forecasting over the last decade, operational flood forecasting also appears to show a shift from a so-called single solution or 'best guess' deterministic approach towards a probabilistic approach based on ensemble techniques. While this probabilistic approach is now more or less common practice and well established in the meteorological community, operational flood forecasters have only started to look for ways to interpret and mitigate for end-users the prediction products obtained by combining so-called Ensemble Prediction Systems (EPS) of Numerical Weather Prediction (NWP) models with rainfall-runoff models. This paper presents initial results obtained by combining deterministic and EPS hindcasts of the global NWP model of the European Centre for Medium-Range Weather Forecasts (ECMWF) with the large-scale hydrological model LISFLOOD for two historic flood events: the river Meuse flood in January 1995 and the river Odra flood in July 1997. In addition, a possible way to interpret the obtained ensemble based stream flow prediction is proposed.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.