Abstract

Application of recent advances in numerical weather prediction (NWP) has the potential of allowing delivery of flood warning to extend well beyond the typical lead times of operational flood warning at the river basin scale. A prototype system, a European Flood Forecasting System (EFFS) developed to deliver such pre-warnings, aiming at providing a pre-warning at lead times of between 5 and 10 days is described. Considerable uncertainty in the weather forecast at these lead times, however, means that resulting forecasts must be treated probabilistically, and although probabilistic forecasts may be easy to disseminate, these are difficult to understand. This paper explores the structure of operational flood warning, and shows that integration in the flood warning process is required if the pre-warning is to fulfil its potential. A simple method of summarising the information in the pre-warning is presented, and the system in hindcast mode is shown to give clear indication of an upcoming major event in the Rhine basin up to 10 days before the actual event. Finally recommendations on the use of data assimilation to embed the EFFS system within an operational environment are given.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.