Abstract

The replacement of a strategic bridge at a remote, environmentally sensitive location on the UK's main west-coast railway in just five days required a tremendous amount of advance planning. The 135 year old Float viaduct crossing the upper reaches of the River Clyde needed to be replaced as part of Railtrack's upgrade of the busy route to suit 200 km/h electric trains. Working under a fixed-price design-and-construct contract, Carillion and Scott Wilson opted to move both the old bridge deck out and the new bridge deck in by lifting rather than sliding. Apart from the first span initially refusing to move, the meticulously planned project went without a hitch and was completed well within the five-day track possession.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.