Abstract

Compared with scaled-model testing, full-scale destructive testing is more reliable since the test has no size effect and can truly record the mechanical performance of the structure. However, due to the high cost, only very few full-scale destructive tests have been conducted on the flexural behavior of prestressed concrete (PC) box girders with girders removed from decommissioned bridges. Moreover, related destructive testing on the flexural behavior of a new precast box girder has been rarely reported. To investigate the flexural behavior and optimize the design, destructive testing of a 30-meter full-scale simply supported prestressed box girder was conducted at the construction site. It is illustrated that the failure mode of the tested girder was fracture of the prestressing tendon, and the corresponding maximum compressive strain in the top flange was only 1456 μ ε , which is far less than the ultimate compressive strain (3300 μ ε ). Therefore, the concrete in the top flange was not fully utilized. A nonlinear analysis procedure was performed using the finite strip method (FSM). The validity of the analysis was demonstrated by comparing the analytical results with those of the full-scale test in the field and a scaled model test in a laboratory. Using the developed numerical method, parametric analyses of the ratio of reinforcement were carried out. The prestressing tendon of the tested girder was increased from four strands to six strands in each duct. After the optimization of the prestressed reinforcement, the girder was ductile and the bearing capacity could be increased by 44.3%.

Highlights

  • When the load was 1872 kN, the corresponding maximum compressive strain was only 1456με, which is far less than the ultimate compressive strain (3300με) [55]

  • The measured cracking load was 750 kN, which is 1.98 times the applied load corresponding to the designed ultimate state of bearing capacity

  • It is necessary to necessary optimize the is far lessthe than the ultimate compressive strain (3300 it is to με, which is far less than the ultimate compressive strain (3300 με )

Read more

Summary

Introduction

Many civil infrastructures are operated under adverse service conditions [1], such as corrosion [2,3,4], vibration [5,6], overload [7,8], and impact [9], which may cause structural damages at different levels, including loosened connections [10], cracks [11,12], reduced bending stiffness [13,14], and decreased or even lost load carrying capacity [15,16]. Civil infrastructures often involve large-sized structural components, making destructive. The North Approach Bridge of the Jingyue Yangtze River Bridge, located in Hubei province, China.

Methods
Results
Discussion
Conclusion

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.