Abstract

The car of the future will be driven by software and offer a variety of customisation options. Enabling these customisation options forces modern automotive manufacturers to update their standardised scheduling concepts for testing and commissioning cars. A flexible scheduling concept means that every chosen customer configuration code must have its own testing procedure. This concept is essential to provide individual testing workflows where the time and resources are optimised for every car. Manual scheduling is complicated due to constraints on time, predecessor-successor relationships, mutual exclusion criteria, resources and status conditions on the car engineering and assembly line. Applied methods to handle the mathematical formulation for the corresponding industrial optimisation problem and its implementation are not yet available. This paper presents a procedure for automated and non-preemptive scheduling in the testing and commissioning of cars, which is built on a Boolean satisfiability problem on parallel and identical machines with temporal and resource constraints. The presented method is successfully implemented and evaluated on a variant assembly line of an automotive Original Equipment Manufacturer. This paper is the starting point for an automated workflow planning and scheduling process in automotive manufacturing.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call