Abstract

Aiming at the problem that the previous flexible machine network integrated scheduling algorithm only considers positive sequence scheduling, which leads to the extension of product completion time, a reverse-order machine network integrated scheduling algorithm based on the dynamic root node operation set is proposed. In order to avoid the constraints of multi-predecessor operations in the process of forward-order scheduling, an encoding method based on dynamic root node operation set is proposed to ensure the validity of constraints among operations. The crossover methods based on crossover row vector and subtree are proposed to ensure the legitimacy of offspring individuals. The chaotic mutation method based on sibling operation and the random mutation method based on mutation row vector are proposed, respectively, to ensure the diversity of the population. A local search strategy based on the critical operation machine set is proposed, which enhances the search ability of the algorithm for optimal solutions. The comparative experimental results show that the proposed algorithm’s solving speed and solution quality outperform other comparison algorithms.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.