Abstract
Abstract The substation is an important node in the power system. Reducing the operating costs and carbon emissions of substations is of great significance for power enterprises to reduce costs and carbon emissions. Meanwhile, with the development of new substations, more substations have added rooftop photovoltaic systems to reduce carbon emissions. How to improve the utilization rate of rooftop photovoltaic power generation has also become a key focus of substation development. This article establishes a flexible load optimization scheduling model for substations, and based on the consideration of system costs, sets up two scenarios for comparison. The research results indicate that the flexible load optimization scheduling model for substations can significantly reduce the operational carbon emissions and costs caused by electricity consumption within the substation.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.