Abstract

In real-world manufacturing, disruptions are often encountered during the execution of a predetermined schedule, leading to the degradation of its optimality and feasibility. This study presents a hybrid approach for flexible job-shop scheduling/rescheduling problems under dynamic environment. The approach, coined as ‘HMA’ is a combination of multi-agent system (MAS) negotiation and ant colony optimisation (ACO). A fully distributed MAS structure has been constructed to support the solution-finding process by negotiation among the agents. The features of ACO are introduced into the negotiation mechanism in order to improve the performance of the schedule. Experimental studies have been carried out to evaluate the performance of the approach for scheduling and rescheduling under different types of disruptions. Different rescheduling policies are compared and discussed. The results have shown that the proposed approach is a competitive method for flexible job-shop scheduling/rescheduling for both schedule optimality and computation efficiency.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.