Abstract

SUMMARY An algorithm for the near real-time dispatching and routing of multiple products in a Flexible Assembly System (FAS) environment, called schedule, was described in an earlier paper. This paper presents extended test conditions and results associated with the use of schedule over the test conditions. The extended testing includes results on algorithm performance for larger and more complex assemblies, larger workloads, parametrization on the urgency factor setting in schedule randomization of job due-dates, and a distribution of the job release dates for the workloads assigned to the FAS.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.